Custom mould design turns a part file into a tool that can be built, run and maintained. It starts with a review of the part, continues through DFM analysis, parting line and gating decisions, cooling design and ejection, and ends with a 3D design review before any steel is cut. DFM at the front of the process is what stops expensive corrections at the trial stage.

Start with the part: what we check before quoting

Before a mould is quoted, the part itself is checked. Wall thickness, draft angles, ribs and bosses, undercuts, threads, tolerances and cosmetic surfaces all affect the tool. So does the resin: shrinkage, viscosity, abrasiveness and heat sensitivity decide how the cavity is laid out.

This review is also where a quotation becomes specific. A part with a deep undercut needs a slider or lifter; a part with a fine texture needs a steel that can hold it; a part with a tight tolerance needs a process that can repeat it. Quoting without this review produces a number, not a tool specification.

DFM analysis: wall thickness, draft, ribs and gates

DFM analysis compares the part with known moulding behaviour. Uneven wall thickness causes sink marks and warpage. Insufficient draft causes drag marks and ejection damage. Badly placed ribs create weld lines or traps. Gate position decides where the flow ends and where air and weld lines appear.

The output is a practical list, not a theory paper: what to change, why, and what happens if it is not changed. Some findings are mandatory, such as a draft that would stop the part releasing. Others are trade-offs, such as a gate mark on a visible surface. Our injection moulding design considerations guide covers the same checks from the buyer’s side.

Parting line and core and cavity split

The parting line decides how the part is split between core and cavity, and it drives much of the tool design. It must sit where the flash line is acceptable, where the mechanisms can work, and where the mould can be machined and maintained.

A poor parting line creates visible flash on a cosmetic surface, forces complicated slides, or makes the tool hard to vent. A good one keeps the mechanisms simple and the tool robust. This is the decision where experienced input saves the most cost later, because moving a parting line after design release means re-cutting steel.

Feed system: cold runner, hot runner or valve gate

The feed system decides how melt reaches each cavity. A cold runner is simple and flexible, but produces runner scrap and needs degating. A hot runner keeps the melt hot to the gate, reducing scrap and cycle time but adding manifold, nozzles and temperature control. A valve gate adds positive shut-off and better gate appearance.

The right choice depends on cavity count, resin, appearance, colour-change frequency and volume. There is no universal answer. The design should state the gate type, the gate position and the expected gate mark, so the customer can approve the visible result before machining. More detail sits in our mould R&D and process capability overview.

Cooling design: drilled lines versus conformal cooling

Cooling is the largest share of the cycle and a major influence on part quality. Conventionally drilled lines are economical and sufficient for many parts. Conformal cooling, built around the part shape, can reach areas that straight lines cannot and even out the temperature field.

Cooling design must also be practical: circuits need access for maintenance, and they must avoid interference with ejectors, slides and screws. A theoretical cooling layout that cannot be serviced will not hold production. The design review should show the circuit path, the fittings and the maintenance access.

Ejection, slides, lifters and unscrewing

Ejection is where many trial problems appear. The part must release without marking, sticking or cracking, which means enough ejection area, correct draft and correctly placed ejector pins. Sliders and lifters handle undercuts, while collapsible cores and unscrewing devices handle threads.

Every mechanism adds cost and maintenance points, so the design aim is the minimum mechanism that can do the job. A design review should ask whether an undercut can be moved, a thread can be formed by a different method, or a part feature can be simplified. This is where DFM and mould design meet.

3D design review before any steel is cut

The 3D design is the last cheap place to change a mould. At review stage the customer can still see the gate location, the parting line, the ejector layout, the cooling path and the mechanisms. After steel is cut, each of those changes becomes a machining job.

The review should produce a signed-off drawing, not a verbal agreement. For thin-wall packaging, the thin-wall container mould page shows how wall section and cooling decisions come together. For the material side, our plastics material guide explains shrinkage and processing behaviour.

What you receive at each design stage

A clear design process produces documents, not just a tool. At quotation stage you should receive a DFM summary and a tool specification. At design review you should receive the 2D mould layout, the 3D mould design and the runner and cooling concept. Before shipment you should receive the trial report, dimensional data and the mould drawings.

Ask for the deliverable list at the start. A supplier who cannot say what documents the customer will receive is likely to improvise later, and documentation is exactly what a buyer needs when the mould is maintained, duplicated or moved. Our mould service page describes how documentation and after-sales support fit together.

Frequently asked questions

What is DFM analysis and is it free?

DFM (design for manufacture) analysis reviews a part against the realities of injection moulding: wall thickness, draft, ribs, gate position, ejection and likely defects. It happens before steel is cut, so changes are still cheap. Whether the review is free depends on the project scope; SinoMould reviews a part file and reports the findings before quoting the tool.

Which files do you need to start mould design?

A STEP or IGES 3D file is ideal. A detailed 2D drawing also works and is useful for tolerances, datums and critical features. If the part exists only as a sample, we can measure and reconstruct it, but that adds a step and should be agreed before design starts.

How long does mould design take before machining?

It depends on part complexity, the number of review rounds and the runner and cooling decisions. A simple part moves through design faster than a large tool with sliders, unscrewing and a hot runner. The sequence stays the same: part review, DFM, concept, 3D design, customer review, then machining.

Can you design from a sample or a drawing only?

Yes. From a sample we measure the part and rebuild the 3D model, then design the mould around it. From a 2D drawing we work with the dimensions and tolerances given. In both cases the customer approves the reconstructed or interpreted geometry before the mould design is frozen.

Who owns the mould design and 3D files?

Ownership should be agreed in the contract before work starts. Many buyers require the mould drawings and 3D data to be handed over with the tool. SinoMould confirms the deliverable list, including drawing formats, at the quotation stage so there is no ambiguity after shipment.

Send a STEP file for a DFM review

Share your part file, resin and annual volume with [export@sinomould.com](mailto:export@sinomould.com), or request a mould quote. SinoMould will review the part, report the DFM findings in plain language and propose a mould concept before any steel is cut. With 20+ years of mould making, a 70,000 m² manufacturing base and ISO-certified quality management, we handle custom mould design from first review through trial and mass production.

Design rules in this guide are general engineering guidance. The final design depends on the part, resin, machine and production plan agreed for your project.

Related mould guides

Continue with the next step of the mould project: